OFFICE SPACE FOR SALE IN ARD EL GOLF, HELIOPOLIS - MASR EL GEDIDA

Redcon administrative office, 70m with 10%DP

Property Type:

Office Space

Property Size:

753 sqft / 70 sqm

Bathrooms:

1


13,000,000 EGP

Payment method

Installments

Down payment

1,300,000 EGP


Report this listing

Location

Map

Ard El Golf

Cairo, Heliopolis - Masr El Gedida

Agent

Angel peshoy

Coldwell Banker Gate

(837 Properties)

Description

“REDCON” About us
Redcon is one of the five largest companies in the construction sector with more than thirty years of experience and a previous history of more than 250 major projects, such as the New El Alamein Towers, the Samsung Factory in Beni Suef, the Maspero Triangle, and other huge projects.
Redcon Development Company has more than 15 years of experience in the field of real estate development and has delivered more than 100,000 square meters of administrative buildings in the Fifth Settlement, such as Building 47 / Building 140 / Odeh Building / Building 223 / ABB and Pharco Building / Building 226 Apex Pharma and many others. other buildings)

- - - - - - - -
-GOLDEN Gate/ Golden Gate
- It is one of the largest projects in the Egyptian market at the present time due to its unique location and specifications, as the project land is located in the most important sector in New Cairo (Golden Square) on the southern 90th Street and directly in front of the American University and
- The project falls under the green architecture projects that aim for sustainability, and it is a project with a total building area of 200,000 commercial administrative meters to meet all the needs of the market.
The project consists of 29 buildings, and each building was designed with a ceiling height for the shops of 6 to 9 meters, and a ceiling height for the administrative part of 4 meters.
Two floors of garages were designed with an area of 250,000 square meters and their capacity reaches 8,000 cars, with 20 entrances and exits to the garage for ease of use, designed by M. Osama Aqeel.
The project was designed in cooperation with the British companies WATG and the American SWA
- All services related to the project can be used and benefited from through a mobile application
Two central cooling stations powered by natural gas were designed to reduce air conditioning operating expenses
The first phase of the project will be delivered in October 2024

Reference:

coldwellbankergate-7937664

Listed:

1 month ago


13,000,000 EGP

Payment method

Installments

Down payment

1,300,000 EGP

Report this listing